We intervene in:
- Factory acceptance testing (FAT)
- On-site supervision and equipment assembly
- Mechanical inspection (VM)
- Commissioning preparations and fluid-less tests (PMER)
- Commissioning and operations optimisation
- Conducting of performance tests
- After sales monitoring of installations